Please use this identifier to cite or link to this item: http://repository.kln.ac.lk/handle/123456789/4433
Title: In-time Rice Irrigation Water Management Under Limited Water Supply
Authors: Najim, M.M.M.
Haque, M.A.
Lee, T.S.
Keywords: Canal flow simulation
water allocation
canal tilling time
and rice irrigation
Issue Date: 2005
Publisher: Pertanika Journal of Science and Technology
Abstract: In-time water distribution of canal water to the farmers has been a majorconcern of managers, planners and researchers involved in irrigation. This study analyzed the ways for water distribution and timely water release in a rice growing area during the pre-saturation period and the normal irrigation supply periods. The analyses were carried out using field data collected at the Besut Irrigation Scheme located in the northeastern corner of Peninsular Malaysia in the state of Terengganu. The scheme comprises two sub-schemes, giving a total irrigation area of 5, 164 ha for the overall Besut Irrigation Scheme. Based on field water requirements and available flows at the intake gates, canal simulations were performed and results show that land preparation should not be done continuously unless flow rates are at least 9.00 m3/s and 3.00 m3/s at the Besut Barrage and Angga Barrage respectively. If the respective flow rates fall below these values, then land preparation should be done in two phases. However, when the flow rate is between 5.00 and 5.50 m3/s at the Besut Barrage, land preparation is recommended to be carried out over three phases. During the normal irrigation supply period, flow rates of 6.00 m3/s and 1.75 m3/s for the Besut and Angga Barrage respectively, are to be maintained for the entire irrigation scheme, otherwise selective irrigation or irrigation on a rotational basis has to be enforced. When flow rates are 7.20 - 9.00 m3/s and 1.70 - 3.00 m3/s at the Besut and Angga Barrage respectively, then water should be released two days before the beginning of the pre-saturation period for the filling main and secondary canals. However, water should be released three days before the beginning of the pre-saturation period when flow rates are between 5.00 and 7.00 m3Is at the Besut Barrage. But irrigation water should release 5.00 hours before beginning the normal supply period in order to maintain the in-time irrigation schedule
URI: http://repository.kln.ac.lk/handle/123456789/4433
ISSN: 0128-7680
Appears in Collections:Zoology

Files in This Item:
There are no files associated with this item.


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.